Project Details
The proposed improvements mainly consist of widening the Florida’s Turnpike from north of the L-38 Canal (MP 80.2) to north of Atlantic Avenue (MP 82.4) from the existing 6-lane divided expressway to a 10-lane divided typical section with 4-general travel lanes and 1 thru lane in each direction. Thru lanes will be separated from general purpose toll by a buffer delineated with two 6-inch solid lines.
The project also includes replacement of the Yamato Road bridges, widening the bridge over Clint Moore Road, replacement of the bridge over L-38 Canal, widening the bridge over Atlantic Avenue milling and resurfacing, noise barriers, roadway lighting, and signing and pavement markings.
Project Resources
PROJECT STATUS
- The Design for this project is on hold until Fiscal Year 2024
- Construction is not funded
Contact
Carlos Estrella, PE
Project Manager
Florida’s Turnpike Enterprise (Atkins)
Tom Alexander
Community Outreach Specialist
Florida’s Turnpike Enterprise (WSP USA)