Project Details
The proposed improvements mainly consist of widening Florida’s Turnpike Mainline/SR91 from north of Glades Road (MP 76.8) to north of the L-38 Canal (MP 80.2) from the existing six-lane divided expressway to a ten-lane divided typical section with four-general travel lanes and one thru lane in each direction. Thru lanes will be separated from general purpose toll by a buffer delineated with two six-inch solid lines.
The project also includes replacement of the Yamato Road bridges, widening the bridge over Clint Moore Road, replacement of the bridge over L-38 Canal, milling and resurfacing, noise walls, roadway lighting, and signing and pavement markings.
PROJECT STATUS
- The Design for this project is on hold until Fiscal Year 2024
- Construction is funded for Fiscal Year 2027
Contact
Terry Miller, PE
Project Manager
Consultant to Florida’s Turnpike Enterprise
Daniel Jimenez
Community Outreach Specialist
Consultant to Florida’s Turnpike Enterprise