FPID: 446975-1

A virtual public hearing was held for this project on Monday, October 20, 2025, and an in-person public hearing was held on Tuesday, October 21, 2025. A video of the virtual public hearing is posted in the “Documents” section.

Introduction

Florida Department of Transportation (FDOT), Florida’s Turnpike Enterprise (Enterprise) is conducting a PD&E Study for a new interchange along Florida’s Turnpike (SR 91) in Martin County, Florida. The project will evaluate the addition of a new system-to-system interchange between Florida’s Turnpike and Interstate 95 (I-95/SR 9) in the vicinity of the I-95/SE Bridge Road interchange.

Flowchart of transportation development: five phases, focusing on Phase 2, Project Development and Environment Study.

The PD&E study is the second phase of the FDOT project development process. Each PD&E study requires the combined efforts of professional engineers, planners and scientists, to collect data, and analyze project-related information to determine social, economic, physical, and environmental impacts. Afterwards, they develop the best solution for a community’s transportation needs.

Click here to see the PD&E Process video

Noise Studies will be performed as part of this PD&E study in the fall of 2024.

Click here to see the Turnpike Traffic Noise video.

Project Background

The Florida’s Turnpike (SR 91) within the project area consists of a four-lane limited access toll facility, two lanes in each direction. However, the recently completed Florida’s Turnpike Widening PD&E study (FPID: 423374-1) calls for the Turnpike from Jupiter (Indiantown Road/SR 706) to Ft. Pierce (Okeechobee Road/SR 70) to be widened to an eight-lane facility, four lanes in each direction, throughout the project study area. The posted speed limit along Florida’s Turnpike is 70 miles per hour (MPH).

I-95 within the project area consists of a six-lane limited access roadway, three lanes in each direction. The I-95 Multimodal Master Plan – Treasure Coast (FPID: 436577-1) recommends I-95 be widened to an eight-lane facility, consisting of three general purpose lanes and one managed lane, throughout the project study area. The posted speed limit along I-95 is 70 MPH.

The purpose of this PD&E study is to develop and evaluate alternative designs for a new system-to-system interchange between Florida’s Turnpike and I-95 at the SE Bridge Road crossing.

The purpose of this interchange is to:

  • Improve system linkage
  • Improve traffic operations and travel time reliability
  • Enhance safety
  • Enhance emergency response and evacuation

During the PD&E study, multiple opportunities will be scheduled for the community to provide input. The No-Build (No Action) alternative will also be analyzed and compared against the Build alternatives during the PD&E study.

Study Area

The project limits for the study include:

  • The area along the Turnpike extends approximately 2 miles north and south from the SE Bridge Road crossing over the Turnpike
  • The area along I-95 extends approximately 2 miles north and south from the SE Bridge Road crossing under I-95
  • The area between the Turnpike and I-95 within these roadway limits
Map showing I-95 and Florida’s Turnpike study area from Jupiter to Stuart, with exit numbers and county lines.

Environment

In this PD&E study, the study will examine the existing environmental conditions across the Social, Cultural, Natural and Physical Environments, so that the potential impacts of various project alternatives can be analyzed. The Social Environment in the project area consists of rural agricultural and commercial lands, including improved pasture, row crops, the Hobe Sound Farmers Market and plant nurseries. There are planned residential developments within adjacent areas. Within the Natural Environment, there is potential habitat for multiple listed species of plants and animals as well as wetlands. There are relatively few sensitive noise receptors due to the rural nature of the project area. The project crosses multiple basins and surface waters that may flow north towards the St. Lucie River or south towards the Loxahatchee River, depending on location.

Innovation

The Enterprise is at the forefront of planning for a safer, more efficient, and technologically advanced transportation system for the future. The Enterprise continually seeks opportunities to integrate emerging transportation technologies that can help reduce congestion, create mobility choices, minimize environmental impacts, and improve safety. The Enterprise also recognizes that connected and automated vehicle (CAV) technologies hold unprecedented opportunities for enhancing mobility and increasing safety on our roadways.

If you have an idea for a technology or innovation that you would like to be considered as part of this study, please reach out to one of the contacts in the Stay Connected section below.

Schedule

Timeline with five stages: Begin Study Apr 2023, Kickoff Aug 2023, Info July 2024, Hearing Oct 2025, Completed Q1 2026.
Schedule is subject to change.

Stay Connected

Project inquiries, comments, innovation/technology ideas, or requests to be added to the project mailing list, can be mailed or emailed to:

Jazlyn Georges, P.E.

Project Manager
Consultant to Florida’s Turnpike Enterprise

Ronald Kareiva, P.E.

Project Development Engineer
for Florida’s Turnpike Enterprise

Media inquiries should be directed to the FDOT, Florida’s Turnpike Enterprise, Public Information Office using the contact information below:

Fiorella Teodista

Communications Outreach Coordinator 

Florida’s Turnpike Enterprise

If you choose to provide feedback on this site or in an email, such information is a public record under Florida’s Government in the Sunshine Laws and available for public inspection upon demand. Under Florida law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status.

If you need special accommodations under the Americans with Disabilities Act or require translation services (free of charge), please contact the Project Manager using the contact information listed on this page. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 955-8770 (voice).