This exhibit presents the proposed improvements for the North project. Please note that north is facing downward. The North project continues the widening of Florida’s Turnpike from four to eight lanes for 3.8 miles, beginning just north of CR 33 to the CR 470 Interchange. The North project includes replacement of the Florida’s Turnpike bridge over CR 48.
The project ends at the CR 470 interchange where no changes to the existing bridge or roadway approaches are proposed. In this area, portions of the ramps will be reconstructed, including rebuilding them where necessary to tie them into the existing ramps.
Visual barrier walls are proposed at locations shown on the exhibits.
Other project elements include drainage improvements such as stormwater ponds and culvert extensions, Intelligent Transportation Systems (ITS), retaining walls, signing and pavement markings, and lighting.