You are invited to a Public Information Meeting on this project. There are three participation options to select from:
- Virtually via a computer, tablet, smartphone on Tuesday, April 16th, 2024, at 12:00 P.M. (Noon)
- By Telephone in listen-only mode on Tuesday, April 16th, 2024, at 12:00 P.M. (Noon)
- In-person on Thursday, April 18th, 2024, at the La Quinta Inn & Suites located at 3701 N. University Dr., Coral Springs, Florida. The doors open to the public at 5:00 P.M. and the meeting begins at 5:30 P.M
Project Details
Florida’s Turnpike Enterprise (FTE), part of the Florida Department of Transportation (FDOT), is planning to widen the Sawgrass Expressway (SR 869) from north of Sample Road to west of SR 7 (US 441) from six to ten lanes. This corridor will be constructed in two segments and will enhance roadway safety, improve traffic operations, better facilitate emergency evacuations, and provide additional capacity to meet future traffic demands.
These projects are currently in the design phase. Design is the third phase of the FDOT Project Development Process. Construction plans, specifications, and final estimates to build a project are developed during this phase.
Key Improvements Includes:
- Widening from six (6) to ten (10) lanes
- Interchange improvements at:
- Coral Ridge Drive
- University Drive
- Bridge widening and reconstruction
- Stormwater management improvements
- Noise walls improvements
Noise Studies are performed in the PD&E phase and the Design phase, and re-evaluated if there is a major change in design to the roadway alignment.
Project Status
- These projects are currently in Design.
- Construction is funded in FDOT fiscal year 2026.
Project Area
Project Schedule
Documents