FPID: 435461-4 & 435461-5

Project Details

Florida’s Turnpike Enterprise (FTE), part of the Florida Department of Transportation (FDOT), is planning to widen the Sawgrass Expressway (SR 869) from north of Sample Road to west of SR 7 (US 441) from six to ten lanes. This corridor will be constructed in two segments and will enhance roadway safety, improve traffic operations, better facilitate emergency evacuations, and provide additional capacity to meet future traffic demands. These projects are currently in the design phase. Design is the third phase of the FDOT Project Development Process. Construction plans, specifications, and final estimates to build a project are developed during this phase.

Flowchart showing phases of Transportation Development Process: Planning, PD&E Study, Design, Right of Way, Construction.

Key Improvements Includes:  

  • FPID 435461-4: Widening from six (6) to eight (8) lanes
  • FPID 435461-5: Widening from six (6) to ten (10) lanes
  • Interchange improvements at:
    • Coral Ridge Drive
    • University Drive
  • Bridge widening and reconstruction
  • Stormwater management improvements
  • Noise walls improvements
Noise Studies are performed in the PD&E phase and the Design phase, and re-evaluated if there is a major change in design to the roadway alignment. Click here to see the Turnpike Traffic Noise video

Project Status

  • These projects are currently in Design.
  • Utilities and Construction are funded in FDOT Fiscal Year 2026.

Project Area

Map showing a road project from Coral Ridge Dr to SR 7 with interchange improvements. Meeting at La Quinta Inn & Suites.

Project Schedule

Timelines for two road projects: meetings in 2024, design by 2025-2026, construction starts in 2026.

Stay Connected

Project inquires, comments, innovation/technology ideas, or requests to be added to the project mailing list, can be mailed or emailed to:

Jason Christopher, P.E., ENV SP

Project Manager Consultant to Florida’s Turnpike Enterprise

Media inquiries should be directed to the FDOT, Florida’s Turnpike Enterprise, Public Information Office using the contact information below:
 

Fiorella Teodista

Communications Outreach Coordinator  Florida’s Turnpike Enterprise

If you choose to provide feedback on this site or in an email, such information is a public record under Florida’s Government in the Sunshine Laws and available for public inspection upon demand. Under Florida law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. If you need special accommodations under the Americans with Disabilities Act or require translation services (free of charge), please contact the Project Manager using the contact information listed on this page. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 955-8770 (voice).