Project Details
The proposed improvements mainly consist of widening the Florida’s Turnpike from north of Atlantic Avenue (MP 82.6) to north of Boynton Beach Boulevard (MP 87.3) from the existing 6-lane divided expressway to a 10-lane divided typical section with 4-general purpose lanes and 1-managed lane in each direction. Managed lanes will be separated from general purpose toll by a buffer delineated with two 6-inch solid lines.
The project also includes widening the bridge over Boynton Beach Boulevard and interchange improvements, milling and resurfacing, noise barriers, roadway lighting, and signing and pavement markings.
Project Resources
PROJECT STATUS
- The project is in Design that will only progress to Phase II
- Construction is not funded