from WPB Service Plaza to North of Okeechobee Blvd. (SR 704) MP 94 – 101

FPID: 406143-5  /  FPID: 406143-8

Project Details

FPID: 406143-5 (MP 94-98)

The project widens the Florida’s Turnpike Mainline (SR 91) from the West Palm Beach Service Plaza to north of Southern Boulevard (SR 80 / US 98). The widening will increase the number of lanes from four to eight.
Work includes pavement widening, reconstruction, milling and resurfacing, bridge improvements/replacements, drainage improvements, and noise walls in qualifying areas. Interchange improvements are proposed at the Southern Boulevard (SR 80 / US 98) interchange.

 


 

FPID: 406143-8 (MP 98-101)

The project widens the Florida’s Turnpike Mainline (SR 91) from north of Southern Boulevard (SR 80 / US 98) to north of Okeechobee Blvd. (SR 704). The widening will increase the number of lanes from four to eight.
Work includes pavement widening, reconstruction, milling and resurfacing, bridge improvements/replacements, drainage improvements, and noise walls in qualifying areas. Interchange improvements are proposed at the Jog Road interchange, and Okeechobee Boulevard (SR 704) interchange.

Project Area

Click FPID numbers for more information.

Contact

Carlos Estrella, PE

Project Manager

Florida’s Turnpike Enterprise (Atkins)

Tom Alexander

Community Outreach Specialist 

Florida’s Turnpike Enterprise (WSP USA)