Project Details
This project converts a portion of the shoulder along with minor widening to add auxiliary lanes to a segment of Florida’s Turnpike Mainline / SR 91 from the Miramar Parkway Bridge to north of Johnson Street. The project will increase the number of lanes from six to eight and will include one auxiliary lane in each direction.
This is a Transportation Systems Management and Operations (TSM&O) project.
This project converts a portion of the shoulder along with minor widening to add auxiliary lanes to a segment of Florida’s Turnpike Mainline / SR 91 from Johnson Street to north of Griffin Road / SR 818. The project will increase the number of lanes from six to eight and will include one auxiliary lane in each direction.
This is a Transportation Systems Management and Operations (TSM&O) project.
Project Status
- This project is currently in Design.
- Construction is scheduled to begin in 2024.
DOCUMENTS
- Public Meeting Video
- About the Project
- Adjacent Projects
- Typical Section for Turnpike (FPID 446223-1)
- Typical Section for Turnpike (FPID 446224-1)
- Area Maps – 1
- Area Maps – 2
- Area Maps – 3
- Area Maps – 4
- Aerial Maps – Hollywood Blvd. Interchange
- Improve Travel Time Reliability & Enhance Safety
- Hollywood Blvd. Traffic
- Contact Information
- Title VI
Contact
Paul Naranjo, PE
Project Manager
Consultant to Florida’s Turnpike Enterprise
Daniel Jimenez
Florida’s Turnpike Enterprise (WSP USA)