Project Details
This project converts a portion of the shoulder along with minor widening to add auxiliary lanes to a segment of the Turnpike Mainline / SR 91 from the Miramar Parkway Bridge to north of Johnson Street. The project will increase the number of lanes from six to eight and will include one auxiliary lane in each direction.
This is a Transportation Systems Management and Operations (TSM&O) project.
This project converts a portion of the shoulder along with minor widening to add auxiliary lanes to a segment of the Turnpike Mainline / SR 91 from Johnson Street to north of Griffin Road / SR 818. The project will increase the number of lanes from six to eight and will include one auxiliary lane in each direction.
This is a Transportation Systems Management and Operations (TSM&O) project.