Widen Sawgrass Expressway (SR 869) FROM US 441 (SR 7) To Powerline Road Public Hearing
Public Hearing Video
Project Study Area
Project Purpose and Need
No-Build Traffic Conditions
Safety
Preferred Project Alternative
3D Graphics of Preferred Alternative
Preferred Alternative Traffic Conditions
Evaluation Matrix
Projects Benefits
Adjacent Projects
SW 10th Street Project Preferred Alternative
Milestone Schedule
Title VI
The PD&E Study limits extend along the Sawgrass Expressway and SW 10th Street from west of US 441 to Powerline Road, around four miles. The study also includes around three miles of Florida’s Turnpike from Wiles Road to the Broward/Palm Beach County Line. The project is located within Broward County. There are three existing interchanges within the project limits, US 441 (SR 7), Lyons Road, and Florida’s Turnpike (SR 91).
Improvements to the study area are needed to enhance safety. Between the years 2017 and 2021, there were almost 1,900 crashes within the study limits, resulting in 555 injuries and 13 fatalities. These crashes equate to an economic cost of 276 million dollars. If nothing is done, increased congestion will lead to an increase in crashes.
The conceptual plans show the preferred alternative design and roadway cross sections along the Sawgrass Expressway and Florida’s Turnpike.
All graphics are also available for download on the main project website (www.Sawgrass441toPowerline.com) under ‘Documents – Public Hearing’.
The Build and No-Build alternatives were compared. The Build alternative, or preferred alternative, eliminates mainline backups and reduces travel time by 36% within the study area. The proposed interchange and intersection improvements decrease signal delay within the study area by 67%. The preferred alternative also reduces congestion on local and adjacent roadways such as US 441, Lyons Road, Sample Road, and Glades Road.
FDOT District Four is moving forward with the SW 10th Street Connector project. The limits of the FDOT District Four project overlap with the limits of this PD&E Study between Florida’s Turnpike and Powerline Road. The SW 10th Street Connector project will end west of Florida’s Turnpike. The preferred alternative of this PD&E Study was conceptually designed to have a seamless connection with the SW 10th Street project.
There is extensive ongoing coordination between the Enterprise and FDOT District Four projects.
The next step of the PD&E Study is to incorporate your input from this public hearing. After the comment period closes and your input has been considered, a decision will be made, and the final PD&E Study documents will be approved. The PD&E Study is expected to be completed by summer 2024. Please note that this schedule is subject to change.
This project is being developed in accordance with the Civil Rights Act of 1964. Under Title VI of the Civil Rights Act, public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. Please contact one of the Title VI coordinators shown here to express any concerns regarding Florida Turnpike’s compliance with Title VI.