SAWGRASS EXPRESSWAY (SR 869) WIDENING

from North of Sample Road to West of SR 7 (US 441), Broward County, FL
Financial Project ID Number: 435461-4 & 435461-5

Public Hearing:

  • Virtual: Thursday, April 18, 2024, 5:30 pm – 7:30 pm
  • In-Person : Thursday, April 18, 2024, 5:30 pm – 7:30 pm at La Quinta Inn & Suites – Grand Ballroom
    3701 North University Drive, Coral Springs, FL 33065

 

Welcome to the Sawgrass Expressway widening meeting, Broward County, FL. Includes images of the expressway and logo.

WELCOME

to the Public Information Meeting for

SAWGRASS EXPRESSWAY (SR 869) WIDENING


from North of Sample Road
to West of SR 7 (US 441),
Broward County, FL

FPIDs: 435461-4 & 435461-5

Title VI compliance notice for a project with contact info for Susan Sadighi and Stefan Kulakowski. Public meeting on April 16.

Florida’s Turnpike Enterprise – Title VI Coordinator

The proposed project is being developed in accordance with the Civil Rights Act of 1964. Under Title VI of the Civil Rights Act, public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.


 

To express concern(s) relative to the Department’s compliance with Title VI, please contact the following:


FDOT Statewide Title VI Coordinator

Susan Sadighi, P.E.
Interim District Title VI Coordinator

Florida Department of Transportation
Florida’s Turnpike Enterprise
P.O. Box 613069
Ocoee, Florida 34761
(407) 264-3640

[email protected]

 

Stefan Kulakowski, CPM, FCCM
State Title VI Coordinator

Florida Department of Transportation
Equal Opportunity Office
605 Suwannee Street, MS-65
Tallahassee, Florida 32399
(850) 414-4742

[email protected]

 


El proyecto propuesto está siendo desarrollado de acuerdo con la Ley de Derechos Civiles de 1964. Bajo el Título VI de la Ley de Derechos Civiles, se solicita la participación del público sin distinción de raza, color, origen nacional, edad, sexo, religión, discapacidad o estado familiar. Las personas que deseen expresar sus preocupaciones pueden comunicarse con una de las oficinas mencionadas arriba. Para asistencia en español, contactar a Laura Duran al 407‑264‑3106 o [email protected].

Map and timeline of the Sawgrass Expressway widening project in Broward County, FL, showing project details and dates.

ABOUT THE SAWGRASS EXPRESSWAY

The Sawgrass Expressway (SR 869) is a 21-mile limited access roadway located in northern Broward County that:

• provides a vital link to southwest Florida, and to southern Broward and Miami-Dade Counties;
• is designated as an evacuation route; and
• provides connectivity to other evacuation routes such as I-75, the Florida’s Turnpike Mainline (SR 91), and I-95.


PROJECT DESCRIPTION

This project involves widening the Sawgrass Expressway from north of Sample Road (Mile Post 12) to west of SR 7/US 441 (Mile Post 18.4) from the existing six lanes to ten lanes. Interchanges at Coral Ridge Drive and University Drive will be reconstructed or rehabilitated for operational capacity and safety enhancements.

Specific improvements include converting the Coral Ridge Drive interchange to a full diverging diamond interchange with two through lanes in each direction, and widening University Drive to accommodate an additional through lane (three lanes in total) at the existing diamond interchange. The Sawgrass Expressway Mainline bridges at Coral Ridge Drive, Coral Springs Drive, University Drive, and Riverside Drive will be widened to accommodate two additional lanes in each direction.


PROJECT INITIATION TIMELINES

(Dates are subject to change)

Two project numbers are shown:

Project 435461-4

Public Meeting – 2nd Quarter 2024
Design Complete – 1st Quarter 2026
Begin Construction – 3rd Quarter 2026

Project 435461-5

Public Meeting – 2nd Quarter 2024
Design Complete – 2nd Quarter 2025
Begin Construction – 1st Quarter 2026

Map highlighting adjacent projects along Sawgrass Expressway, Florida, with project details and locations.

ADJACENT PROJECTS

Project Facility FPID Location Description
1 Sawgrass Expressway 437153-1 South of US 441/SR 7 to Powerline Rd PD&E Study: Widen 8→10 lanes + interchange improvements
2 SW 10th Street 439891-1 Florida’s Turnpike to SW 24th Ave Design: Add 4 connector lanes
3 I-95 & SW 10th Street 436964-2 I-95 (Sample Rd to Hillsboro Blvd); SW 10th (SW 24th to I-95) Design: Connector interchange
4 Florida’s Turnpike 442212-1 I-595 to Wiles Rd PD&E: Widen to 10 lanes
5 Sawgrass Expressway 435461-5 University Dr to SR 7 Design: Widening & interchange improvements
6 Sawgrass Expressway 435461-4 Sample Rd to University Dr Design: Widening & interchange improvements
7 Sawgrass Expressway 435461-1 Atlantic Blvd to Sample Rd Design: Widening & interchange improvements
8 Sawgrass Expressway 443956-1 Atlantic Blvd Interchange Construction: Widening & interchange improvements
9 Sawgrass Expressway 437155-6 Oakland Park Blvd to Atlantic Blvd Design: Widening & interchange improvements
10 Sawgrass Expressway 437155-1 Sunrise Blvd to Oakland Park Blvd Design: Widening & interchange improvements
11 Sawgrass Expressway 437155-5 NW 8th St to Sunrise Blvd Design: Widening + new interchange
12 Florida’s Turnpike 415927-1 Sawgrass Expressway to Glades Rd Design: Widen to 8 lanes
Proposed Sawgrass Expressway section widening from 6 to 10 lanes with detailed lane and shoulder measurements shown.

Cross Section Breakdown (Per Direction)

  • 5 travel lanes × 12 ft each = 60 ft

  • 1 inside shoulder = 15 ft

  • 1 outside shoulder = 12 ft

  • Median = 32 ft total width

Total Cross Section Width (approximate)

Left side (shoulder + 5 lanes + inside shoulder):
12 + (5 × 12) + 15 = 87 ft

Median: 32 ft

Right side (inside shoulder + 5 lanes + outside shoulder):
15 + (5 × 12) + 12 = 87 ft

Approximate total width:
87 + 32 + 87 = 206 ft

SAWGRASS EXPRESSWAY (SR 869)
Post Construction, Looking North

(Widening from 6 lanes to 10 lanes; all lanes to be opened after construction)

Contact info for Sawgrass Expressway widening project. Emails: Jason.Christopher@dot.state.fl.us, Kerry.French@dot.state.fl.us.

CONTACT INFORMATION

We would appreciate your written questions and comments no later than Saturday, April 27, 2024.

Jason Christopher, P.E., ENV SP
Project Manager
Consultant to Florida’s Turnpike Enterprise

Florida Department of Transportation
Florida’s Turnpike Enterprise
P.O. Box 613069
Ocoee, Florida 34761
(407) 264-3260

[email protected]


Kerry French
Community Outreach Coordinator
Florida’s Turnpike Enterprise

Florida Department of Transportation
Florida’s Turnpike Enterprise
P.O. Box 613069
Ocoee, Florida 34761
(407) 264-3908

[email protected]

COMMENT FORM