Statewide Tolls Design Support
- 2023 GTR Tolling Forum Presentation (posted 08/22/2023)
- Toll Facilities Scope Section 31T (posted 01/19/2024)
- Toll Facilities Staff Hours Form Tab 31T (posted 01/10/2024)
- Toll Facilities Engineer’s Estimate Template (posted 04/14/2023)
- GTR Deviation Submittal Letter Template (posted 08/07/2023)
- Toll Siting Technical Memorandum (TSTM) Template (posted 04/14/2023)
- Roadside Tolling Cabinet Infrastructure Technical Special Provisions (posted 09/12/2023)
- Toll Loop Conduit Salvage Detail (PDF) (CAD) (posted 09/20/2022)
Statewide Tolls Project Management Support
- Project Checklist for Tolls Design Coordination and Support (posted 07/24/2023)
- Toll Project Responsibility Matrix (posted 12/13/2022)
The District Production Project Manager must communicate with the Turnpike Production Project Manager who will engage with the Toll Systems Project Manager and the Tolls Design Administrator through each phase of the project. Each project should have a complete matrix that is agreed and accepted by both District and Turnpike Project Managers prior to the Phase II plan submittal.
Statewide Tolls Construction Support
- Toll Facility Code Compliance and Permit Procedures (posted 07/24/2024)