Title of the Project

FPID: 555555-1

Suspendisse potenti. Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Nulla ut consectetur nibh, ut fringilla nibh. Pellentesque ullamcorper tempus urna, vel porta justo accumsan nec. Nam porta mattis eros. Ut eget leo elementum, scelerisque ipsum in, pellentesque velit. Nunc ac ultricies nisi.

Use the “Locate an Address” tool to view the footprint of the draft highway alignment and interchange configurations, in relation to an address.

Introduction

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque a odio vitae ligula tristique lobortis vitae sit amet est. Proin sit amet dolor non quam tempor commodo eu sed nunc. Duis blandit enim eu mattis gravida.

Cras ut pharetra purus. Etiam finibus ultricies lacus in faucibus. Morbi nisl lacus, egestas quis imperdiet ac, porttitor sit amet metus. Duis dictum tristique elementum. Fusce facilisis id turpis ac ullamcorper. Maecenas in neque pellentesque, auctor tortor at, euismod diam.

Nam elementum, purus quis pulvinar venenatis, erat sapien bibendum elit, a vestibulum ligula sapien vel erat. Integer laoreet dolor enim, non imperdiet elit pellentesque ac.

Phase 1

Planning

Phase 2

Project Development and Environment (PD&E) Study

Phase 3

Design

Phase 4

Right of Way Acquisition

Phase 5

Construction

The PD&E study is the second phase of the FDOT project development process.

PROJECT BACKGROUND

Vestibulum a massa dui. Phasellus lobortis sem tellus, id mollis massa porttitor vel. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia curae; Cras ac nisi dolor. Sed eu augue a enim hendrerit aliquam. Integer rutrum tempus magna, ut maximus lectus semper id.

Phasellus eu eros in risus elementum egestas. Phasellus nec vulputate orci, non consectetur massa. Sed dictum, tellus a porttitor malesuada, massa urna tincidunt urna, id mollis elit mi at lacus. In fringilla sapien non augue cursus, nec laoreet massa accumsan. Sed varius erat eu lorem accumsan, et venenatis augue scelerisque.

 

The need for the Title of Project includes:

  • Accommodating Year 2055 transportation demand
  • Improving regional connectivity
  • Enhancing freight mobility and economic competitiveness
  • Enhancing safety and emergency evacuation

 

The No-Build (No Action) alternative will also be analyzed and compared against the Build alternatives during the PD&E study.

Project Area

Integer a nisi id quam hendrerit fringilla. Curabitur scelerisque diam lorem. Mauris bibendum, augue eget pellentesque viverra, dolor turpis sagittis orci, vel gravida ipsum justo sed tortor. Nulla et massa tristique, tempus lorem at, ullamcorper dolor. Sed sodales gravida auctor.

Donec vel tristique purus, eu commodo dui. Donec eget magna odio. Etiam euismod euismod neque ut dapibus.

Map showing future road connectors in Davenport and surrounding areas, including Poinciana Parkway extensions and routes.

ENVIRONMENT

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque a odio vitae ligula tristique lobortis vitae sit amet est. Proin sit amet dolor non quam tempor commodo eu sed nunc. Duis blandit enim eu mattis gravida. Cras ut pharetra purus.

Etiam finibus ultricies lacus in faucibus. Morbi nisl lacus, egestas quis imperdiet ac, porttitor sit amet metus. Duis dictum tristique elementum.

INNOVATION

The Enterprise is at the forefront of planning for a safer, more efficient, and technologically advanced transportation system for the future. The Enterprise continually seeks opportunities to integrate emerging transportation technologies that can help reduce congestion, create mobility choices, minimize environmental impacts, and improve safety. The Enterprise also recognizes that connected and automated vehicle (CAV) technologies hold unprecedented opportunities for enhancing mobility and increasing safety on our roadways.

Icon depicting a car with wireless signals emanating from it, representing connected or autonomous vehicle technology.

SCHEDULE

Begin Study

April

2026

Public Information Meeting

August

2026

Public Hearing

2nd Quarter

2027

Study Complete

3rd Quarter

2026

Note: This schedule is subject to change.

Stay Connected

Project inquiries, comments, innovation/technology ideas, or requests to be added to the project mailing list, can be mailed or emailed to:

Name LastName, PE

Project Manager
Consultant to Florida’s Turnpike Enterprise

Name LastName, PE

Project Development Engineer
Florida’s Turnpike Enterprise

Media inquiries should be directed to the FDOT, Florida’s Turnpike Enterprise, Public Information Office using the contact information below:

If you choose to provide feedback on this site or in an email, such information is a public record under Florida’s Government in the Sunshine Laws and available for public inspection upon demand. Under Florida law, email addresses are public records. If you do not want your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in writing.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status.

If you need special accommodations under the Americans with Disabilities Act or require translation services (free of charge), please contact the Project Manager using the contact information listed on this page. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1 (800) 955-8771 (TDD) or 955-8770 (voice).

Contact Form